1. K.E.S.C Fifth and Sixth Power (sector loan) Project, Karachi

  • Client / Consultant: K.E.S.C / ICC (Pvt) Ltd.
  • Project cost: Rs. 268 million.
  • Work completed: Piling and pile foundation works for more than 800 poles / towers
    in Karachi (3,200 piles).
  • Piling footage = 209, 920

2. K.E.S.C Bin Qasim Thermal Power Station, Extension Project Unit-6, Lot III, Transmission Line, Karachi

  • Client / Consultant: K.E.S.C / China Northwest Power Group.
  • Project cost: Rs. 15 million.
  • Work completed: Completed piling works for more than 75 poles/towers in Karachi.
    (300 piles).
  • Piling footage = 19,720.

3. 28MW Combined Cycle Plant at K-Electric Grid Station Korangi, Karachi

  • Client / Consultant:
    K-Electric / I.E.G / Principal Builders
  • Project cost:
    Rs. 9.5 million
  • Work completed:
    Pile test and piling works at KElectric Grid Station, Korangi, Karachi.
    Piling footage = 1,056.

4. LDC Building (Gizri), K.E.S.C, Karachi

  • Client / Consultant:
    K.E.S.C / Nespak
  • Project cost:
    Rs. 18 million
  • Work completed:
    Piling test and piling works for 180 piles.
    Piling footage = 8,856

5. K.E.S.C Overhead transmission line from North Nazimabad to F.B.Area Grid Station, Karachi

  • Client / Consultant:
    KESC / Nespak
  • Project cost:
    Rs. 15 million
  • Work completed:
    Pile and pile foundation works for 40 poles/towers.
    Piling footage = 7,872.

6. Transmission line for in and out Arrangement of Terbala Grid Station

  • Client / Consultant:
    WAPDA / ICC (Pvt.) Ltd.
  • Project cost:
    Rs. 16 million
  • Work completed:
    Pile and pile foundation works for 20 towers.
    Piling footage = 6,560

7. 500KV Overhead Transmission line from Barotha to Rawat, Islamabad

  • Client / Consultant:
    WAPDA / ICC (Pvt) Ltd.
  • Project cost:
    Rs. 28 million
  • Work completed:
    Pile and pile foundation works for 35 towers.
    Piling footage = 11,480

9. Flood Lighting Mast, National Cricket Stadium, Karachi

  • Client / Consultant:
    Pakistan Cricket Board / Tyco
  • Project cost:
    Rs. 12 million
  • Work completed:
    Piling and pile foundation works for flood lighting mast – 6 pile foundations.
    Piling footage = 1,417.

10. Flood Lighting Mast, National Hockey Stadium, Lahore

  • Client / Consultant:
    Pakistan Hockey Federation / Phillips
  • Project cost:
    Rs. 9 million
  • Work completed:
    Piling and pile foundation works for flood lighting mast – 6 pile  foundations.
    Piling footage = 1,574

11. JJVL Cryogenic LPG Recovery Plant, Jamshoro (Phase I & II)

  • Client / Consultant:
    Jamshoro Joint Venture Limited (JJVL) / HANNOVER
  • Project cost:
    Rs. 110 million
  • Work completed:
    JJVL- I & II Piling and foundation work completed for JJVL LPG Plant. More than 1,000 piles.
    Piling footage = 45,920.

12. New US Consulate (Phase I & Phase II) Karachi

  • Client / Consultant:
    US Consulate / Mettis-Epik
  • Project cost:
    Rs. 28 million
  • Work completed:
    Pile test and piling works – More than 500 piles.
    Piling footage = 24,600

13. Ethylene Storage Tank Foundation, Port Qasim, Karachi

  • Client / Consultant:
    Engro Vopak (Pvt.) Ltd. / CNEC
  • Project cost:
    Rs. 70 million
  • Work completed:
    Pile test works (vertical, horizontal and tension), 185 piles and 1,000m3 concrete pile cap.
    Piling footage = 21,238

14. Karachi Port Trust (K.P.T) Flyover

  • Client / Consultant:
    Karachi Port Trust / Nespak
  • Project cost:
    Rs. 30 million
  • Work completed:
    Pile tests and piling works for KPT Flyover, more than 700 piles.
    Piling footage = 68,880.

15. Shaheed-e-Millat Flyover (K.D.A)

  • Client / Consultant:
    Karachi Development Authority (K.D.A) / Binny & Partners.
  • Project cost:
    Rs. 30 million
  • Work completed:
    Pile test and piling works for more than 500 piles.
    Piling footage = 32,800.

16. The Arkadian Towers, Karachi

  • Client / Consultant:
    Creek Developers Private Ltd / Alliance Consultant (Pvt.) Ltd.
  • Project cost:
    Rs. 262 million
  • Work completed:
    Pile Test and piling works for 360 piles Creek View and Creek Terraces “Block D”.
    Piling footage = 53,136

17. Centre Point / Trakker Towers, Karachi

  • Client / Consultant:
    Associated Constructors (Pvt.) Limited (ACL) / A.A.A Consulting Engineers
  • Project cost:
    Rs. 10 million
  • Work completed:
    Piling works for more than 300 piles at Centre Point Towers in
    Karachi.
    Piling footage = 19,680.

18. Wind Power Project (FWEL-I &II), Gharo Thatta, Sindh

  • Client / Consultant:
    Descon Engineering Ltd.
  • Project cost:
    Rs. 30 million
  • Work completed:
    Pile load test in compression and tension for 50MW Foundation Wind Energy I, II. (10 nos.)

19. Crescent Bay (Emaar) Development Project, Karachi (BLOCK V)

  • Client / Consultant:
    Emaar Pakistan Ltd / Giga.
  • Project cost:
    Rs. 100 million
  • Work completed:
    Pile tests and piling works for more than 1,000 piles.
    Piling footage = 82,138.

20. GAL AXACT, Karachi

  • Client / Consultant:
    AXACT / Beg Associates
  • Project cost:
    Rs. 3 million
  • Work completed:
    Pile load test in compression
    (1,200 tonnes).